Article

Sustainability on the Warehouse Floor: More Than a Checkbox for CPG Shippers.

Navigate the transition from LE-WM or LE-TRA with confidence.

Westernacher favicon
Share this article
Follow us on Linkedin
Most CPG shippers have set sustainability targets, and a large share of the waste and emissions behind those targets comes from packing and moving products. Yet in many companies the targets never reach the warehouse. The distribution center is measured on cost per case, pick rates and on-time shipping. The sustainability team reports a footprint once a year, largely from estimates.
So, the daily decisions that drive packaging waste and freight emissions (which carton a picker uses, how full a trailer leaves, how far a forklift travels) are made with no sustainability data attached. Nobody can say what those decisions cost or save, and the program stalls at the reporting stage.
Let’s look at how to close that gap with systems many shippers already run: SAP Extended Warehouse Management (EWM) and SAP Transportation Management (TM) for execution, and SAP Sustainability Control Tower for measurement and reporting.

The checkbox problem

For many shippers, sustainability reporting is a yearly exercise: pull numbers from spreadsheets, estimate the rest, submit. Nobody ties it to execution, so nobody knows what it costs or saves.
Yet the biggest drivers of a shipper’s footprint (excess packaging, half-empty trailers, wasted travel inside the DC) are also P&L line items. Sustainability and cost efficiency are largely the same problem seen from two sides. The question is whether you can measure it.

Three levers in SAP EWM and SAP TM

SAP EWM and SAP TM already run daily execution. Used with sustainability in mind, three existing capabilities stand out:

  • Packaging optimization. Cartonization logic determines how much air you ship. Done well, it cuts material use, damage and dimensional weight charges.
  • Load building (TM). Package building and load planning are SAP TM functions. TM decides which freight goes on which truck, and its load planning engine places pallets on the vehicle within weight, dimension, stacking and axle constraints. Through the direct TM–EWM integration, the packaging TM planned is passed to EWM, so the warehouse builds the pallets TM planned. Fuller trailers mean fewer trips for the same volume, which lowers freight spend and emissions together.
  • Smarter slotting. Placing fast movers near pick and dock areas cuts travel distance and equipment run time, which means less energy use, faster picks and less congestion.
None of this is a new functionality. What’s new is treating it as a sustainability lever, not just a productivity tool.

The missing piece: data you can trust

Improvements happen, but without reliable data they can’t be proven. SAP Sustainability Control Tower (SCT) brings sustainability data together with the operational data you already run on. Fed with execution data from EWM and TM, it makes:

  • Waste reduction measurable, tracked against shipment volumes rather than annual totals
  • Transportation efficiency visible, with load utilization and trip counts tied to cost and emissions KPIs
  • Reporting defensible, grounded in transactional data rather than manual collection
  • Improvements justifiable, because measurable results give you a business case for the next investment

How does EWM data get into SCT?

SCT ships standard integrations for SAP S/4HANA Finance, SAP Datasphere, SAP EHS environment management and SAP Sustainability Footprint Management, plus an inbound API for other sources. Warehouse execution data, such as packaging material consumed per handling unit, transportation unit utilization or travel distance from warehouse tasks, is not one of the standard feeds.
In practice, the relevant EWM and TM data is modeled in SAP Datasphere (or SAP BW) and mapped to SCT’s data provider interfaces or sent through the inbound API. Deciding which EWM and TM fields become which KPI and making sure master data such as packaging material weights is accurate enough to report on is where most of the effort in such a project sits.
The principle: what the warehouse executes, the data records, and the control tower reports.

A practical path

Start with focus, not a massive transformation:

1. Pick your levers. Start where you lose the most money today. For example: high dimensional-weight surcharges as a share of parcel spend point to packaging; trailers regularly leaving with unused space point to load building; long pick travel and high forklift hours point to slotting.

2. Baseline. Measure where you stand on each lever and note where data is missing. Typical metrics:

    • Packaging: kg of packaging material per case shipped, average carton fill rate (product volume ÷ carton volume), void fill used, damage rate
    • Load building: average trailer cube and weight utilization, trips per 1,000 cases, share of LTL vs. full truckload, freight cost and CO2e per pallet
    • Slotting: travel distance per pick line, forklift hours or kWh per 1,000 cases, picks per hour
Common gaps include missing tare weights on packaging materials, no link between freight orders and emission factors, and no energy data per piece of equipment.

3. Configure for outcomes. Tune packaging specifications, cartonization and slotting in EWM, and load planning in TM.

4. Connect the data. Define the KPIs and feed them into SAP Sustainability Control Tower (SCT), so operations and sustainability teams work from the same numbers.

5. Reinvest the savings. Every lever produces hard savings: less packaging material bought, fewer trucks dispatched, lower dimensional-weight charges, less equipment energy. Track those savings per lever and use the documented results as the budget and business case for the next phase, so each round helps pay for the next.

From obligation to advantage

Retailers, regulators, and consumers want real progress. The winners won’t have the most polished reports, but they’ll be the ones who can show, with data, how their warehouse operations cut waste and freight costs. On the warehouse floor, sustainability can simply be the result of running a better operation.

From obligation to advantage

Talk to our experts! We can help assess your SAP EWM environment and identify opportunities for improvement in your sustainability objectives.

Write to us .

Capabilities
Inspiration
Responsibility
People
We
Choose your language

Use of cookies

Westernacher uses cookies to provide you with a more responsive and personalized service. By using this site you agree to our use of cookies. Please read our cookie notice for more information on the cookies we use and how to delete or block them.